First Seven Dwarfs Mine Train ride-through video shared by Walt Disney World as ‘final gem’ of New Fantasyland nears completion

Originally posted by Ricky Brigante http://www.insidethemagic.net on February 24, 2014

mine-train
During a live chat with Imagineer Dave Minichiello on the Disney Parks Blog, a sneak preview of the inside of the Seven Dwarfs Mine Train ride was revealed through a newly released video ride-through.
The video shows a side-by-side comparison between a rendering of the ride-through along with real footage of almost the entire ride, still under construction, with many effects yet to be installed – such as the Dwarfs themselves.
Video: Early Seven Dwarfs Mine Train ride-through


ride3-550x295
ride-550x143
ride2-550x142

Minichiello described the video: “What’s interesting about the video is that there’s a CGI model, which was the first concept model that we developed for this show. What’s amazing is seeing how accurate it was to our initial concept and vision. What’s amazing is how accurate the sight lines are, the staging, the scaling, the variable speeds. We’re fortunate to use innovative technologies during the development of our attraction.”

Minichiello is the creative director on the Seven Dwarfs Mine Train, working on the new ride for around two years. He shared a few photos of the track, including what it looks like to stand on the bridge crossing ride’s path.

phpmgrsijimg_1862-550x412
phpm8l9t3img_1857-550x533

The ride vehicles themselves are emphasized as the star of the attraction, featuring the ability to rock left and ride while navigating turns. “It’s a completely new experience - not only having the sensation of pivoting back and forth and it varies throughout the attraction,” wrote Minichiello. “You feel differences in the various terrain around the mountain.”

phpvap1stwdi_train-550x570

Little else was added about the upcoming ride, though it was noted that progress is moving along inside the attraction, as props are being added to the Dwarfs’ cottage, paint on the rock work, and a forest is appearing throughout the ride’s exterior.

phpwkddwz08-550x366
phpRnhJj4SevenDwarfsMineTrainexterior-550x292
The ride’s interactive queue will offer guests a chance to sort and wash the Dwarfs’ jewels and venture into their vault for the first time. The queue will include a song that was originally written for the “Snow White” film called “Music In Your Soup,” in a new instrumental version as if it was played by the Seven Dwarfs.
The height requirement to ride the Seven Dwarfs Mine Train will be 38″.
The Seven Dwarfs Mine Train is scheduled to open in Spring 2014, with no specific opening date offered yet.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s